Caterham Seven User Manual Page 155

  • Download
  • Add to my manuals
  • Print
  • Page
    / 227
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 154
Page | 154
The carpet must fit flat at the transmission
tunnel. If necessary, small cuts should be
made in the area of the corners to allow
the tabs on the carpet to hinge out against
the transmission tunnel.
Once the carpet has been fitted around
the transmission tunnel apply adhesive to
the carpet and press into position against
the seat back. It is only necessary to
apply adhesive as far down as the top of
the transmission tunnel as the remainder
of the carpet is behind the seats.
10.3) Transmission tunnel carpet
Attach the small aluminium transmission
tunnel cover on the rear of the
transmission tunnel top using the 5/32"
rivets provided.
Ensure that the reverse light switch and
associated blanking grommet have been
installed prior to fitting the transmission
tunnel carpets. The transmission tunnel
carpets are handed so ensure that the
correct carpet is fitted to each side.
Coat the transmission tunnel with
adhesive and stick the transmission tunnel
carpets to the transmission tunnel.
Ensure that good adhesive coverage is
maintained, particularly in the forward
section of the transmission tunnel.
10.4) Transmission tunnel top
NOTE
Do not attempt to fit the tunnel top until
the tunnel carpet adhesive is completely
dry.
The transmission tunnel top incorporates
a padded armrest, the gear lever gaiter
and the handbrake gaiter. On R300/R400
models the two electrical plugs on the
underside of the tunnel top must be
connected to the two plugs in the
transmission tunnel.
Pull the handbrake near vertical. Fit the
transmission tunnel top, ensuring that the
handbrake and gear lever locate in the
respective gaiter and press firmly into
position over the sides of the transmission
tunnel carpets.
Screw the gear knob into position and lock
with a grubscrew.
10.5) Rubber footwell mats
Place the mats in the respective footwell
(mats are handed).
They are secured into the footwell using
the three poppers fitted at the rear of the
footwell.
Attach 3 popper bases (fastener pack
ZIT03 Item 2) to the rear of the front
footwell using rivets (1) through which
need to be drilled in the floor panel.
Page view 154
1 2 ... 150 151 152 153 154 155 156 157 158 159 160 ... 226 227

Comments to this Manuals

No comments